55 Cutters Way - Index of Working Drawings
NOTE: Page will automatically refresh every 2 minutes.
Drawing 1
Upper Level Floor Plan
Updated drawing 1E. Published 18/5/16
Drawing 2
Lower Level Floor Plan
Updated drawing 2D. Published 18/5/16
Drawing 3
North and South Elevations
Updated drawing 3B. Published 18/5/16
Drawing 4
East and West Elevations
Updated drawing 4B. Published 13/5/16
Drawing 5
Section A-A
Updated drawing 5A. Published 9/5/16
Drawing 6
Section B-B
Updated drawing 6B. Published 18/5/16
Drawing 7
Section C-C
Updated drawing 7A. Published 9/5/16
Drawing 8
Section D-D
Updated drawing 8B. Published 18/5/16
Drawing 9
Drawing 10
Floor Framing sections 1, 2 & 3
Updated drawing 10A. Published 9/5/16
Drawing 11
Floor Framing detail Sections 1 & 2
Updated drawing 11B. Published 10/5/16
Drawing 12
Floor Framing detail Sections 3 & 4
Updated drawing 12A. Published 18/5/16
Drawing 13
Roof plan
Updated drawing 13A. Published 9/5/16
Drawing 14
Drawing 15
Front Barge detail
Updated drawing 15A. Published 9/5/16
Drawing 16
Eaves detail
Updated drawing 16B. Published 13/5/16
Drawing 17
West Verandah Eaves detail
Updated drawing 17B. Published 18/5/16
Drawing 18
Window schedule
Updated drawing 18C. Published 18/5/16
Drawing 19
Bifold Door Schedule
Updated drawing 19B. Published 10/5/16
Drawing 20
Site Plan
Updated drawing 20C. Published 18/5/16
Drawing 21
Drawing 22
Entrance verandah eaves detail
First published 18/5/16
Drawing 23
Electrical layout - Upper level See also Drawing 25 Electrical Legend
Published 18/5/16
Drawing 24
Electrical layout - Lower level See also Drawing 25 Electrical Legend Published 18/5/16
Drawing 25
Electrical Drawings Legend
Published 18/5/16
Drawing 26
Master Bedroom Deck detail
First published 18/5/16
Additional Supporting Documents
EngineeringThe engineering requirements are being overseen by Geo Consulting (Scott Brimelow). When completed their reports and requirements will be published in this space. |
|
Building ApprovalSuncoast Building Approvals have been appointed (Michael Grummett). When completed their reports will be published in this space. |
Proprietors Specifications
ITEM |
LINKS |
ALLOWANCE |
Timber Flooring |
||
Carpet |
||
Tiles |
||
Air Conditioning |
||
Stairs |
||
Balustrade (ex stairs) |
||
Solar Hot Water |
||
Solar Power |
||
Doors |
||
Windows |
||
Kitchen (Cabinet) |
||
Kitchen (Appliances) |
||
Light Fittings |
||
Ceiling Fans |
||
Exhaust Fans |
||
Batroom Fittings |
||
Garage Door |
||
Stone Masonry |
||
Fencing |
||
x |
||
x |
||
x |
||
x |
||
x |
||
x |
Additional Reference Material
ITEM |
LINKS |
ALLOWANCE |
x |
||
x |
||
x |
||
x |
||
x |
||
x |
||
x |
||
x |
||
x |
||
x |
||
x |
||
x |
||
x |